Main phases of repair works in the home

Main phases of repair in the apartment.

How to start repair of the apartment?

The first phase of the repair work of old apartment or condos is the destruction and taking apart first off of the worn out walls and partition walls, eliminating the wall and ceiling covering. This stage is one of the most "unclean" phases of the repair.

One more among the most essential and "dusty" works is the window block replacement. It is necessary to do this first off due to the fact that dirt and dust will be unallowable during following stages and it is restricted at all to open windows throughout painting and wallpaper works (large drops of the temperature level and moisture are unallowable). After mounting windows and windowsills it is necessary to pack them right away in polyethylene film and to cover windowsills in addition by the fiber board (in order to prevent scratches).

The following stage is electrical wiring. Wiring can be set up in walls or along the flooring. Electrical wiring is made inside the pipelines to ensure electrical security and boost reliability. The pipeline protects circuitry from external damages and enables to change the wire totally without breaking walls and floor simply by placing the brand-new wire instead of the old one.

House Painting follows the wiring. The regular mistake during the simultaneous conducting of such works happens when workers forget to set out among the cables and home painters have actually already plastered and ravelled the wall. As an outcome, extra works are necessary to seal chases after on the finished wall. The locations of the feed switch and wall outlet area and their number should be thought-out in advance. The scheme of power electrical wiring is normally consisted of into the style project.

Later on the system need to be all set to service in case of failures. In addition to the electrical wirings, the telephone cable television and the TV cable are laid out. The power cable television need to not be set out near the telephone and antenna cable televisions to avoid noise pickup and disturbance. The most peculiar minute is setting out the TV cable. In order to make two (or 3) TV sets in the house the second cable is frequently merely "securely soldered" in parallel, so the cable resistance is lowered. As a result, the screen quality is weakened, lots of programs can't be received and etc. In order to avoid such scenario it is required to welcome a specialist with special equipment. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-term process, that is why it is performed simultaneously in all properties, if it is possible. Delays are related to the technology. Each applied layer of the plaster (or filling out completing) should dry entirely before the work will continue.

Works in sanitary plans and the cooking area begin simultaneously with home painting. It is better to meet so-called "dirty" operate in the top place and simultaneously. In accordance with the plan of the sanitary service technician area welding, wall chasing and pipeline run are performed. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.

Then works in hygienic plans are performed according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below stage is putting together ceiling and laying tiles on the floor. And at last other sanitary devices, mixers and devices are mounted.

image

After circuitry, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not set up during this stage in order to conserve their surface appearance. The finish puttying of walls is performed at the same time. The highly exact control of drying of the layer of the plaster (filling) is carried out by drymeter. It is an unique instrument that measures wetness of the material.

The following stage is the procedure of fill. Fill can be made with various materials-- from typical masonry cement-sand mixture to self-aligning floorings. The benefit of the basic mixture is its cheapness, the disadvantage is that such mix is much more difficult lined up at the level and the faucet buying guide final dry time of such fill is 40 days, just then the next stage of the deal with flooring can be conducted, i.e. the duration is too long. Self-leveling self-aligning floorings are a lot more costly, however more technological. Aligning takes place almost "automatically" i.e. fluid solution of mixture is poured out, then it runs and you receive the horizontal surface. The last dry time is 15 days i.e. you have considerable time economy. The system "warm flooring" is set up into the fill. If the so-called "damp procedures" are inapplicable the technology of the dry aligning (the fill technology) is used bases for floorings with adjustable floor battens are mounted.

After fill door boxes and door are installed. Installation of doors need to take into the account density of future floor covering. After installation the door can be removed its hinges and eliminated up until completion of repair work or packed into polyethylene film to safeguard from damages. Simultaneously ceiling can be painted and the tile can be laid in that properties where it was prepared. The tile should be laid on the absolutely dry overlay.

Finishing of the flooring mounting depends on the prepared covering. For the most part (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close repairing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood gives the additional heat- and acoustic insulation. After mounting of the plywood is ended up, wallpaper for painting can be pasted on walls.

In premises where surface covering of the floor is laminated flooring or parquet stockpile, the common wallpapers are pasted (not for painting) in the very first location. Then the floor covering is mounted.

If surface covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the normal wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The pointed out repercussion is connected only with such rushing process when the fantastic quantity of dust is produced. In spite of the reality that excellent floor mills are geared up with the vacuum cleaner, the sufficient amount of dust is precipitated on surrounding topics including walls. Dust is very acerbic and is severely washed off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be thought about to be completed. It is left just to set up the plinths, ornamental components, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is required to keep in mind that the sequence of works was listed in basic and can change depending upon the certain circumstance-- the variety of rooms in premise, your resources, peculiarities of the building of the multilevel properties. It is based on common sense and everyone efficient in analysis can individually create such a sequence.